You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi saluran jalan kesehatan 3 ist

Jalan Kesehatan III Drainage Upgraded to Prevent Flooding

The Central Jakarta Water Resources Sub-agency (SDA) aims to complete the revitalization of the drainage channel on Jalan Kesehatan III, RW 06, Petojo Selatan, Gambir, by early September 2026.

Thank you for the fast response

Central Jakarta Drainage Maintenance Section Head, Citrin Indriati stated that 10 personnel have been deployed to normalize the 136-meter-long channel.

"The work has been underway since July 8. We are replacing the old drainage with U-ditch concrete blocks measuring 60x60x120 centimeters," she expressed, Wednesday (7/22).

Water Channel Jalan Danau Singkarak Being Normalized

According to her, it follows up on community requests submitted through the Community Development Planning Forum (Musrenbang) 2026. Residents had reported that the existing channel was narrow and silted with mud, causing water to overflow and flood the neighborhood during heavy rains.

"We hope this upgrade will optimize the channel’s capacity. We also urge residents not to cover the newly repaired drains so that maintenance and cleaning remain accessible," she added.

This work received appreciation from Rudi, one of the locals from Jalan Kesehatan III, RW 06, Petojo Selatan.

"Thank you for the fast response. This repair finally addresses the recurring floods we've been facing," he stated.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1633 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye664 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye465 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye401 personDessy Suciati
  5. Ketapang TPS 3R Processes 13 Tons of Waste from Duri Pulo and Petojo Utara

    access_time11-09-2026 remove_red_eye372 personFolmer